More from October 2015 through May 2016. After repairing the bow and painting the decks, things were looking good. A lot of metal was removed top-side. That way I could glass over unwanted holes, refinish worn out areas, and get a clean new surface for future metal. Splendid Isolation still sits in this condition, a […]